Construction manpower calculator — how many people does the work need?

How many masons, carpenters, bar benders and helpers does a job need — and for how long? The CivilOS Manpower Calculator answers that from labour constants, the way a planning engineer does it by hand, in seconds. Pick the works on your site, type the quantities and the days you have, and it gives every trade a day, split into skilled, semi-skilled and unskilled, with supervision, an absence allowance, man-days, man-months and the labour cost at your own wages.

It is the first of CivilOS Tools: free calculators for engineers, contractors, site supervisors and people building their own house. No sign-in, nothing to install, and nothing you type leaves your device. Every number is shown and every number can be changed.

What you can do

FeatureWhat it doesExport / status
Work → ManpowerPick works from 352 items, type quantity and days; get every trade a day, skilled / semi-skilled / unskilled, supervisors and safety stewardsFree
Manpower → TimeType your crew; get the days, the output a day, the trade holding the job back and the crew to finish by a dateFree
Site conditionsNormal or congested site, working height, hot or rainy weather, night shift, crew experience, the hours you work in a dayFree
Library & my ratesEvery labour constant open to edit, your own works and trades, your own daily wagesSaved on your device
Labour costMan-days of each skill class × your wage a day, with supervisionFree
Feet & Indian unitsType plaster in sq ft, brickwork in cft, railings in rft, steel in kg or quintals — converted exactly, the metric figure shown beside itFree
Share as a linkOne link carries the works, quantities, units, days and site settings; whoever opens it sees the same crewFree
ExportsStyled Excel workbook (requirement, works, basis), print or save as PDF, share on WhatsAppExcel · PDF

A worked example

Brickwork in the superstructure takes about 1.00 mason-day, 1.60 mazdoor-days and 0.20 bhisti-days per m³ — a mason lays roughly a cubic metre a day with the helpers. For 100 m³ in 20 working days that is 100 ÷ 20 = 5 masons, 8 mazdoors and 1 bhisti every day. Allow 10 % for absence and the roll is 6 masons, 9 mazdoors and 2 bhistis — 17 workers, and one supervisor with them. Halve the time and the crew doubles: 12 masons, 18 mazdoors, 3 bhistis and 2 supervisors.

Add 800 m² of internal plaster and a 50 m³ slab poured in five days to the same calculation and each trade is added up across the works before it is rounded, so the answer is a crew you can actually hire, not a pile of fractions.

Skilled, semi-skilled and unskilled

Every trade belongs to a class: masons, carpenters, bar benders, welders, fitters, electricians, plumbers, painters and plant operators are skilled; helpers, applicators, insulators, scaffolders and gardeners are semi-skilled; mazdoors, beldars and bhistis are unskilled; mates, supervisors and safety stewards are supervision. The split is what a labour contractor quotes against and what a contract's labour clauses ask for, so it is shown for every answer, with each class's own wage in the cost.

Honest numbers

Labour constants are averages from work study and site records, not promises. Output on a real site moves with the method, the materials, the access, the weather and above all the supervision. That is why every item says where its numbers come from, why the site factors are there, and why any number can be replaced with your own site's. A planning engineer's own records always beat a published average; the calculator is built to hold them.

How to start

  1. Open CivilOS Tools from the menu and press Open the Manpower Calculator — no account needed.
  2. Add the works: search (brickwork, plaster, shuttering, sariya, conduit, WMM…) or browse all 27 groups.
  3. Type each quantity and the days you have; choose whether the works run together or one after another.
  4. Set the site conditions — hours, height, weather, shift — and your wages in Library & my rates.
  5. Download the Excel, print it, or send it on WhatsApp; save the calculation to open again later.

What CivilOS does not do

Where a browser tool fits

A full planning suite schedules resources against a programme and levels them; that is a project-scale job and CivilOS does it in the Project Scheduler. Most manpower questions on a site are smaller and more urgent: how many people do I need to finish this floor by the 30th, how long will this gang take, is the labour contractor's crew enough. A calculator that answers those in a minute, on a phone, with the numbers shown, is the right tool for them.

Open the Manpower Calculator free → no sign-in, nothing to install

Frequently asked questions

Is the manpower calculator free?
Yes, completely. It is part of CivilOS Tools, which anyone can use without an account, without a card and without a limit. What you type is saved in your own browser, not on our server.

Where do the labour numbers come from?
Each work item carries labour constants — the man-days of each trade for one unit of work, for an 8-hour day at a normal site. Where IS 7272 (Part 1) : 1974, the BIS recommendation of labour output constants measured by CBRI Roorkee, gives an item, the calculator uses its figures exactly: 0.50 mazdoor-days per m³ of soft-soil trench excavation, for example, or 0.24 mason-days, 2.50 mazdoor-days and 0.90 bhisti-days per m³ of slab concrete mixed by mixer. Other items use Indian field norms, typical plant crews for mechanised work, or industry norms for MEP, steel, power and solar work. Each item says which.

How is the number of workers worked out?
Man-days of a trade = constant × quantity ÷ productivity. Workers a day = man-days ÷ the days you have. That is grossed up for absence and rounded up to whole people once per trade, so three small works needing a fifth of a bhisti each are one bhisti, not three. Supervisors (one per 25 workers by default) and a safety steward (one per 100) are added on top, and you can change both ratios.

Can I work it the other way round — I have the crew, how long will it take?
Yes. In Manpower → Time you choose the work, type the quantity and the people you actually have, and it gives the days and the output a day, names the trade that sets the pace, says what one more of that trade would save, and gives the crew needed to finish by a date.

My site is faster or slower than these figures. Can I use my own?
Yes. Every item can be edited, either as man-days per unit or as a gang and what it does in a day (for example one mason and two helpers do 10 m² of plaster a day), and you can add works and trades of your own. Your numbers are used everywhere that item appears and are saved on your device.

Does it cover roads, MEP, solar or industrial work, or only buildings?
All of them: earthwork, concrete, formwork, steel, masonry, plaster, flooring, waterproofing, joinery, painting, interiors, structural steel and PEB, plumbing, electrical, HVAC, fire fighting, roads and highways, bridges and piling, water supply and sewerage, railways, power lines, solar, industrial piping and equipment, tunnelling, landscaping and demolition — plus whole-building rough figures per m² for early planning.

Draft for checking. Every safety-critical output of CivilOS is a preparation document. Drawings, quantities, rates, programmes and inspections must be verified, and the result signed off, by a licensed professional before they are issued, tendered, built or paid against.