Manpower planning software for construction — the histogram from your programme, attendance against the plan
Manpower planning on most sites is a histogram somebody drew once for the tender and a register nobody compares with it. The CivilOS Manpower Planner keeps the two together: the programme's activities with their work, the people that work needs week by week, and the people who actually came, day by day, trade by trade.
It starts from what a planning engineer already has — the programme in the Project Scheduler, or the works and quantities in the free Manpower Calculator — and ends with the sheet the client and the PMC ask for: the manpower requirement under their names and logos, and the attendance register against it.
What you can do
| Feature | What it does | Export / status |
|---|---|---|
| Plan | Activities with start and finish dates, the working week and holidays; each activity's people from work and quantity or a crew a day; site settings, absence, supervisors and safety stewards | On screen |
| Histogram | People on the roll week by week or month by month, stacked by class; the same trade by trade; peak, average, man-days, man-months, labour cost | On screen · PDF · Excel |
| Attendance | People present each day against the plan, trade by trade; the register week by week with per cent of plan; trades running short; days not recorded | On screen · PDF · Excel |
| Sheets | Requirement sheet and attendance register in A4 landscape, client, PMC and contractor logos, sheet number, revision and three sign-offs | PDF · Excel |
Rounded once, where a person is a person
Two activities that each need 0.4 of a water carrier a day need one water carrier, not two. So the planner keeps every activity's demand unrounded, adds the activities day by day, and rounds a trade up to whole people once — at the week. The absence allowance is added on the roll, and the supervisors and safety stewards are counted from the workers, as the free calculator counts them.
The free calculator, carried onto the programme
The works in the free Manpower Calculator go across to the planner in one press, each as an activity over its own days, together or one after another as the calculator worked them — and the man-days the planner shows are exactly the calculator's.
How to start
- Open the Manpower Planner with a free account — it opens on a worked example you can change.
- Bring in the programme from the Project Scheduler, or add the activities and their dates by hand.
- Give each activity its people: search a work and type its quantity, or type the crew a day.
- Read the histogram week by week, and the people on the roll trade by trade.
- Record attendance every day, then print the requirement sheet and the register under the three parties' logos, or download the Excel.
What CivilOS does not do
- No levelling of the histogram. It shows the peak; moving activities to smooth it is done in the programme.
- No wage register or payroll. Attendance is head-count by trade against the plan, not names, hours and wages.
- No biometric or face attendance. The numbers are typed by the site.
- No certification. The labour constants are averages for a normal site; check them against your own crews before relying on a figure.
Where a browser tool fits
A contractor with an HR system, biometric gates and a resource-loaded Primavera schedule already has much of this. CivilOS does not replace that.
The planning engineer, PMC or builder whose histogram is a one-off chart in the tender and whose attendance is a register on site — for them, one place where the programme, the people it needs and the people who came sit on one sheet is the step that is missing.
Open the Manpower Planner → it opens on a worked exampleFrequently asked questions
What is a manpower histogram?
A bar chart of the people a project needs on site over time — one bar per week (or month), each as tall as the number of workers that week. Planning engineers draw it from the programme to see the peak, to smooth it, and to tell the contractor how many masons, carpenters and helpers to mobilise and when. CivilOS draws it from the activities' dates and their work: each activity's man-days are spread over its working days, the days are added up across activities, and each week shows the most people a trade needs on any one day of it, rounded up to whole people.
How is the manpower for an activity worked out?
Either from the work — the item and its quantity, using the same labour constants as the free Manpower Calculator (IS 7272 where the standard gives them, field norms otherwise, 8-hour day, adjusted for the site, height, weather and hours worked) — or from the crew you already know you will put on it, such as four masons and six helpers a day.
Is it free?
The Manpower Calculator in CivilOS Tools is free with no sign-in. The Manpower Planner is a paid module: a free account gets a small monthly allowance to try it, and the Pro, Max and Enterprise Seats plans — or the Project Management module group — give it the working hours. Prints carry the CivilOS letterhead on the Free plan and your own on a paid plan.
Can it read my programme from Primavera or MS Project?
It reads the programme in CivilOS's Project Scheduler, which imports Primavera and MS Project exports in Excel or CSV. Bring the programme in again whenever it changes: the dates move, and the people you gave each activity stay.
How is attendance compared with the plan?
Against the people the plan needs present that day — without the absence allowance, because that allowance exists precisely because some of the roll will be away. A day nobody recorded is shown as not recorded, never counted as a day with nobody on site, so the per cent of plan is honest.
Can my team use the same plan?
Yes. Save the plan as a project and share it to your team's cloud in the Team Workspace; the people on your team open the same plan, histogram and register.
Do I need to install anything or create an account?
No installation: CivilOS opens in an ordinary browser on a laptop, tablet or phone and can be installed as an app from the sidebar. A free account is needed to open the engineering modules; it takes a minute and asks for no card.
Draft for checking. Every safety-critical output of CivilOS is a preparation document. Drawings, quantities, rates, programmes and inspections must be verified, and the result signed off, by a licensed professional before they are issued, tendered, built or paid against.